Nippon Rent-A-Car
Tokyo Station Yaesu South Exit
Tokyo Station Yaesu South ticket gate; counter on B2 in Yaesu West Parking.
Area
Plan an Okutama drive from Mitake Gorge through Lake Okutama to Hinohara, with a map, parking, gate hours, walking stops and Mt Mitake cable-car information.
Edited by Drive Scape Japan · Updated: · Sources verified:

Mitake Gorge via Hatonosu, Lake Okutama, the Shuyu Road, Kazahari Pass and Tomin-no-Mori to Hossawa Falls: about 63 km and 2 hours 15 minutes on the mapped section, excluding visits, traffic and interchange approaches.
Kawano Gate–Tomin-no-Mori opens 09:00–18:00 in October–March and 08:00–19:00 in April–September. Gates close at night; continuous rainfall above 140 mm or snow can also close the road.
Refuel in Ome or Akiruno before heading into the mountains. This guide does not confirm a complete filling-station list for the mountain villages; do not rely on roadside stations for fuel.
As of 1 November 2026.
Times to Mitake Gorge, calculated from map data without traffic.
Closures and weather change day by day, so check these pages before you set off.
Nippon Rent-A-Car
Tokyo Station Yaesu South ticket gate; counter on B2 in Yaesu West Parking.
Nippon Rent-A-Car
Building photo ↗Wara070 · CC BY 4.0 · Source · 2026-01-09
B2 of the Shin-Marunouchi Building, connected to Tokyo Station by an underground passage.
Nippon Rent-A-Car
Building photo ↗Kakidai · CC BY-SA 4.0 · Source · 2018-10
About 5 minutes on foot from Shinagawa Station east exit; 1F of the Intercity S&R building.
Nippon Rent-A-Car
About 5 minutes on foot from Shinjuku Station south exit, along Koshu Kaido.
Okutama offers a mountain drive on Tokyo's western edge, linking Mitake Gorge in Ome with Lake Okutama, the Okutama Shuyu Road and Hossawa Falls in Hinohara. You can also extend the trip into Yamanashi to the roadside stations in Kosuge and Tabayama. This guide follows a day from Ome through the lake and over the mountain road to Hinohara, with roads, parking and stops listed below.
Line: 1 → Ome-kaido → 2 → 3 → Okutama Shuyu Road → 4 → 5 → 6 → 7
The map could not be loaded. Use the junction-by-junction directions below.
The line follows the route from Mitake Gorge to Hossawa Falls described below. Numbers mark the stops: green for scenery and nature, blue for roadside stations. Tap a marker to see its name.
Approach from Ome Interchange on the Ken-o Expressway and stop at Mitake Gorge. Follow Route 411, also called Ome Kaido, past Hatonosu Gorge to Lake Okutama. Climb the Okutama Shuyu Road to Tsukiyomi No. 1 car park and Kazahari Pass, then descend past Hinohara Tomin-no-Mori to Hossawa Falls before heading towards Akiruno Interchange.
The mapped section from Mitake Gorge to Hossawa Falls is about 63 km, with roughly 2 hours 15 minutes of driving. These map-based estimates exclude congestion and stops, as well as the approach from Ome IC and return to Akiruno IC.
From 1 October to 31 March, the section between Kawano Gate and Tomin-no-Mori is open only 09:00–18:00. Gates close at night, preventing through traffic. Plan to cross in daylight: dusk comes early in the mountains and fog can reduce visibility.
You cannot drive to the mountaintop. Park at Mitake Tozan Railway's Takimoto Station, with 136 spaces and opening hours of 07:10–19:00, then take the cable car; an adult return ticket costs ¥1,400. Set your navigation destination to “Mitake Tozan Railway Takimoto Station.” The operator warns that searching only for “Mt Mitake” can direct you onto a closed road.
Maintenance suspensions are announced for 9–10 December 2026 and 18–20 January 2027. On the first day of each period, normal services run only through the 08:40 departure. Check the operator's notice before planning a visit.
From Miyama Bridge at the western end of Lake Okutama, take Route 139 to Michi-no-Eki Kosuge or Route 411 to Michi-no-Eki Tabayama. Kosuge is about 30 minutes from Otsuki Interchange and has rapid EV charging.
| Section or stop | Approximate distance or travel time | Suggested visit |
|---|---|---|
| Ome IC → Route 411 → Lake Okutama | About 31 km; allow about 1 hour 20 minutes to the Shuyu Road entrance | — |
| Lake Okutama and Ogouchi Dam | — | 45–60 minutes |
| Lake Okutama → Miyama Bridge → Mito Bridge → Tsukiyomi No. 1 car park | About 17 km | — |
| Tsukiyomi No. 1, Kazahari Pass and Sengenone car park | About 3.5 km to Kazahari Pass, 5 km to Sengenone | 30 minutes |
| Kazahari Pass → Hinohara Tomin-no-Mori | About 3 km; the lake to Tomin-no-Mori is about 20 km or 30 minutes | — |
| Hinohara Tomin-no-Mori and Mito Otaki Falls | Otaki-no-Michi trail: about 20 minutes each way | 60–90 minutes |
| Tomin-no-Mori → Hinohara Kaido → Hossawa Falls | About 24 km or 50 minutes | — |
| Hossawa Falls | About 15 minutes on foot from the car park to the pool below the falls | 45–60 minutes |
| Hossawa Falls → Akiruno or Hinode IC | About 19 km | — |
Driving estimates exclude congestion and breaks; visit durations are planning allowances. Going to the lake first helps avoid returning through Okutama during its usual weekend and holiday congestion peak, around 16:00–19:00. Spend the afternoon on the Hinohara side instead. Akiruno IC to Ome IC is about 12 km on the Ken-o Expressway if you need to return to your starting point. In the opposite direction, you must clear the Tomin-no-Mori–Kawano Gate section before it closes at 18:00 in October–March or 19:00 in April–September, and may meet the evening queues on the Okutama side.
Sengenone car park, at the Shuyu Road's 14.2 km point, has views towards Shinjuku's towers and Tokyo Skytree in clear weather. About 200 m downhill towards Hinohara is the viewpoint the road authority identifies as its only Mt Fuji view. There is no pavement, so be alert to traffic if walking there. Kazuma car park at the 15.0 km point occupies both sides of the road; if Tomin-no-Mori is full, you can park here and walk along the footpath.
Use designated car parks to enjoy the views. Do not stop on the shoulder, squeeze past uphill cyclists or hold up following traffic when you can safely let it pass at a car park. Take litter home; the road has no rubbish bins. Use a lower gear and engine braking on the winding descent.
If rain or fog makes the mountain crossing unsuitable, return from Lake Okutama or approach from Akiruno for Hossawa Falls and Kazuma-no-Yu. The hot spring opens 10:00–19:00, with admission ending at 18:00; adults ¥1,100. It closes Mondays, or the following day after a Monday holiday. In thick fog, use your lights, leave more space and do not stop in the road to look at the scenery. Check event restrictions too: the 4 October 2026 cycling race closed the Hinohara approach between the Yasuragi-no-Sato entrance area and Tomin-no-Mori from 06:30–09:00. That date has passed; it is an example of why the current notices matter.
| Road | What to expect | Length and cost | Hours and restrictions |
|---|---|---|---|
| Ken-o Expressway | Ome, Hinode and Akiruno interchanges serve the area | Tolled | Check current expressway information |
| National Route 411, Ome Kaido | Ome via Hatonosu and Okutama Station to Lake Okutama | Free | Usual return-traffic peak around 16:00–19:00 on weekends and holidays |
| Okutama Shuyu Road | Lake Okutama via Tsukiyomi and Kazahari Pass to Tomin-no-Mori in Hinohara | 19.7 km; free | Kawano Gate–Tomin-no-Mori: October–March 09:00–18:00; April–September 08:00–19:00. Tomin-no-Mori–Kuzuryu Bridge: 05:00–21:00 year-round. Closure possible above 140 mm continuous rainfall or with snow. Speed limit 40 km/h |
| Hinohara Kaido, Prefectural Route 33 | Akiruno via Hinohara towards Tomin-no-Mori and Uenohara | Free | The closure on the Yamanashi side of Kobu Tunnel was lifted on 30 September 2026; check later restrictions before travelling |
| National Route 139 | Miyama Bridge via Kosuge and Matsuhime Tunnel to Otsuki | Free | Check Yamanashi Prefecture's current restrictions. The previously published October30 end date for Seto's old-road works is no longer an upcoming restriction |
| National Route 411 in Yamanashi | Tabayama towards Koshu | Free | Check current mountain-road conditions |
| Nippara Kaido | From near Okutama Station towards Nippara Limestone Cave | Free | Narrow beyond Osawa, with difficult passing places |
Numbers match the map.
| No. | Place | Parking | What to know |
|---|---|---|---|
| 1 | Mitake Gorge | Mitake Enchi: 53 spaces, paid except first 30 minutes and December–February; free alternatives include Kanzanji, 48 spaces | Mitake Exchange Center parking: 16 spaces, ¥500 |
| 2 | Hatonosu Gorge | Paid parking available | Crossing the top of Shiromaru Regulating Reservoir Dam is closed for works through 24 February 2027, scheduled |
| 3 | Lake Okutama and Ogouchi Dam | Free parking beside the Water and Green Friendship Center | Center free, 09:30–17:00; closed Wednesdays, or next day after a Wednesday holiday, and 28 December–4 January. Restaurant 10:00–16:00 last orders, serving Ogouchi Dam curry. Part of the car park is restricted until around 15 March 2027; use Mizune or Omugishiro when busy. Dam-top/tower access can close without notice for weather; Mugiyama and Tozura floating bridges may close at low water levels |
| 4 | Tsukiyomi No. 1 car park | Free; 9.3 km point on the Shuyu Road | Lake Okutama below and Mt Kumotori in the distance. Entrance is on a bend with limited visibility |
| 5 | Kazahari Pass car park | Free; 12.8 km point | At 1,146 m, the road's highest point; colder than the lakeshore |
| 6 | Hinohara Tomin-no-Mori | 100 regular cars; free | Parking 07:00–17:30 on 1 September–15 November; 08:00–17:00 on 16 November–15 March. Usually closed Mondays, or next day after a Monday holiday, and 29 December–3 January; open daily in October–November, 29 April–5 May and 21 July–31 August. Overflow parking has a free shuttle. Otaki-no-Michi reaches the 35 m Mito Otaki Falls in about 20 minutes each way |
| 7 | Hossawa Falls | About 28 regular cars; free | About 15 minutes on foot; steps make the trail unsuitable for wheelchairs. On busy days parking can fill early; do not queue on the road if full. Vehicles of 14 tonnes or more cannot enter. No lighting on the trail after dark |
| — | Nippara Limestone Cave | Free parking available | At the end of Nippara Kaido; closed over New Year |
| — | Takimoto Station for the Mt Mitake cable car | 136 spaces. Weekdays ¥400/hour, daily cap ¥1,500; weekends and designated dates ¥450/hour, cap ¥2,000 | 07:10–19:00; no overnight entry or exit |
| No. | Roadside station | Parking | What to know |
|---|---|---|---|
| 8 | Michi-no-Eki Kosuge | 93 cars and 3 large vehicles | In Kosuge. Shop 09:00–17:00 in April–November, no regular closure; rapid EV charging |
| 9 | Michi-no-Eki Tabayama | 100 regular cars and 3 large vehicles | In Tabayama. Nomekoi-no-Yu hot spring 10:00–19:00, closed Thursdays |
Tomin-no-Mori's report dated 29 October 2026 described the Otaki-no-Michi trail beginning to turn yellow and orange. This is a dated observation, not a forecast for your visit.
| Season | Highlights and cautions |
|---|---|
| Late February–March | Plum blossom in Ome's Yoshino Baigo; the 2026 festival ran 21 February–22 March |
| Late October–November | Autumn colours along the Shuyu Road and at Tomin-no-Mori |
| December–February | Hossawa Falls can freeze, depending on the weather. The mountain road is prone to ice, and snow closures may take time to clear |
| Starting point | Approximate drive |
|---|---|
| Ome IC, Ken-o Expressway | Via Route 411 to the Okutama-side Shuyu Road entrance: 1 hour 20 minutes; Takimoto Station: 40 minutes |
| Hinode or Akiruno IC, Ken-o Expressway | Via Route 33 to the Hinohara-side road approach: 1 hour 20 minutes; Tomin-no-Mori: about 60 minutes, or 37 km |
| Uenohara IC, Chuo Expressway | Via Kobu Tunnel to Tomin-no-Mori: 45 minutes, or 30 km |
| Otsuki IC, Chuo Expressway | Via Route 139 to the Okutama-side Shuyu Road entrance: 1 hour 20 minutes; Michi-no-Eki Kosuge: 30 minutes |
Refuel in Ome or Akiruno before entering the mountains. A complete official filling-station list for Okutama, Hinohara, Kosuge and Tabayama was not confirmed for this guide; do not rely on a roadside-station stop for fuel.
Use the Tokyo rental-car listings to find a pickup location, and check the driving-permit requirements before booking.
Approach from Ome IC, visit Mitake Gorge, Hatonosu Gorge and Lake Okutama, then cross the Shuyu Road via Tsukiyomi, Kazahari Pass and Tomin-no-Mori to Hossawa Falls before returning towards Akiruno IC. The mapped Mitake Gorge–Hossawa Falls section is about 63 km and 2 hours 15 minutes before stops and traffic; add the interchange approaches separately.
Kawano Gate–Tomin-no-Mori is open 09:00–18:00 from 1 October to 31 March and 08:00–19:00 from 1 April to 30 September. Gates close at night. Heavy rain or snow can also close the road.
No. The road is 19.7 km long, with a 40 km/h speed limit and many sharp bends. The road authority warns of frequent accidents, gaps in mobile coverage and hospital transport taking around two hours after an accident. This is a caution about remote access, not a guaranteed emergency response time.
You cannot drive to the mountaintop. Park at Takimoto Station and take the cable car, checking the maintenance dates before travelling.
Refuel in Ome or Akiruno before heading into the mountains.
Last verified: 2026-11-01
Filter by pickup prefecture, vehicle type or station to compare access and opening hours.

How to drive around the Fuji Five Lakes: a one-day loop of the four western lakes from Lake Kawaguchi to Lake Motosu, Mt. Myojin Panorama-dai and Oshino Hakkai, Fuji Subaru Line tolls and hours (no ETC), parking at each stop, autumn leaf crowds and how to get there.

Closing and planned reopening dates for Japan's mountain roads in winter 2026–27, earliest first: Mt. Norikura, Shiga-Kusatsu Road, Zao Echo Line, Bandai-Azuma Skyline, Kamikochi, Venus Line and more, with roads whose dates are not yet announced.

Can you drive in Japan on a US, UK or Australian license? Only with a 1949 Geneva international driving permit. Licenses from Switzerland, Germany, France, Belgium, Monaco and Taiwan need an official Japanese translation instead. How long each lasts, where to get it and what to carry.

A two-hour night loop on Tokyo's Shutoko expressway from Ueno and back: Rainbow Bridge, Haneda Airport, Yokohama Bay Bridge, Tokyo Skytree and Tokyo Tower. Five highlights, junction-by-junction directions, and what visitors need: an IDP, an ETC card, tolls and where to stop.

Seven companies that let visitors drive a Japanese performance car in or near Tokyo, from day rentals to lead-car tours, with published prices, age limits, deposits, pickup points and what your license needs.

Seven Daikoku PA and JDM car tours from Tokyo, booked on the operators' own sites and grouped as passenger rides, self-drive tours and a van tour, with per-car or per-person prices, cars, start points, durations and what each operator says if Daikoku is closed.